Impact factors
|
Number(v)
|
Name of hazards or factors
|
Number of hazards caused
|
Environment factor
|
2
|
Flood
|
19, 60, 62, 64, 65, 66, 67, 69, 150, 156, 158, 167, 190, 191, 192, 193, 195, 273, 325
|
5
|
Heavy rainfall
|
19, 67, 69, 150, 193, 195
|
10
|
Gravel foundation
|
157
|
11
|
Liquefied soil, soft clay and collapsible loess foundation
|
68, 70, 135-136, 157
|
19
|
Landslides in the tailings pond
|
39, 195
|
25
|
There are mining activities near the site
|
19, 62, 64, 66
|
32
|
Insufficient impoundment length (upstream wet tailings impoundment)
|
39
|
34
|
Large catchment area
|
195
|
Material factor
|
39
|
Insufficient storage capacity of tailings pond
|
190
|
45
|
Tailings particle size/gradation does not meet the requirements
|
47, 66, 68, 61, 234
|
47
|
Excessive tailings unit weight
|
68, 61
|
49
|
Strongly corrosive tailings
|
238
|
60
|
Dam break
|
|
62
|
Local landslide and collapse of the dam
|
60
|
64
|
Dam instability
|
60, 62
|
65
|
Dam deformation
|
62, 64, 157, 267, 273
|
66
|
Dam crack
|
62, 64, 73, 158
|
67
|
Dam surface water saturation
|
62, 64-66, 73, 157
|
68
|
Uneven settlement of the dam
|
62, 64-66, 191-192, 267, 273
|
69
|
Scour the dam
|
62, 64-66
|
70
|
Tailings liquefaction
|
62, 64, 68, 136, 156-158
|
73
|
Poor stability of tailings dam slope
|
62, 64
|
77
|
The tailings dam slope ratio is unreasonable
|
62, 64-65, 73, 157
|
78
|
Unreasonable width of dam crest
|
62, 64-65, 157
|
79
|
Improper dam type selection for the initial dam
|
39, 64, 157
|
80
|
The height of initial dam is unreasonable
|
39, 64-65, 73, 81, 194
|
81
|
The ratio of the initial dam height to the total dam height of the upstream tailings dam is unreasonable
|
64-65, 73
|
82
|
The dam layout is unreasonable (the location sub dam and primary dam)
|
32, 39, 69, 73, 135
|
61
|
Poor control of tailings deposits
|
64-65, 68, 77, 152, 157
|
92
|
The tailings dam is not equipped with anti-scouring measures
|
69, 82
|
122
|
There is a horizontal weld on the slope
|
64, 66, 73
|
132
|
No effective filter layer is set on the dam foundation
|
157
|
135
|
Uneven foundation subsidence
|
66, 68, 73, 136, 191, 267, 273
|
136
|
Dam foundation instability
|
64-66, 68, 73
|
149
|
The length or thickness of the horizontal paving in front of the dam is insufficient
|
157
|
150
|
Natural paving (covering) is destroyed
|
158
|
152
|
Poor deposition control for dry beach face
|
157
|
156
|
Leakage damage
|
60, 62, 64
|
157
|
Filter failure
|
64, 67, 136, 156, 167, 195
|
158
|
Leakage channel
|
64, 68, 135-136, 156
|
167
|
Seepage line is higher than control seepage line
|
65-67, 156
|
176
|
Poor drainage of composite geotechnical drainage network
|
157
|
182
|
Unqualified filter material
|
183
|
183
|
Filter failure
|
65, 157
|
190
|
Overtopping
|
60, 62, 64, 69
|
191
|
Fracture of drainage structure
|
66, 69, 158, 192, 200
|
192
|
Leaking drainage structure
|
66-67, 69, 150, 158, 195, 200
|
193
|
Scour or cavitation drainage structures
|
191-192
|
194
|
Insufficient regulating water storage
|
39
|
195
|
Rapid rise of pond water level
|
39, 65, 67, 152, 167, 190, 194
|
197
|
The foundation pit at the higher groundwater level has no drainage facilities
|
195, 200
|
198
|
The flood drainage system does not match the dam construction method
|
191, 200
|
200
|
Insufficient flood discharge capacity
|
193, 195
|
206
|
Insufficient elevation of drainage holes in front of the dam
|
200
|
207
|
Flood drainage structures are directly located on the tailings sediment beach
|
191
|
209
|
Insufficient foundation bearing capacity of underground flood drainage structures
|
191
|
210
|
Improper installation of flood interception and drainage facilities
|
191, 200
|
218
|
Improper installation of energy dissipation facilities
|
191, 193
|
219
|
No energy dissipation measures have been taken in the tailings facility
|
191, 193
|
220
|
The maximum flow rate of flood is greater than the allowable flow rate of the building materials
|
191, 193
|
221
|
The clarified water of the tailings pond is not used for backwater utilization
|
195
|
234
|
Blockage or siltation
|
176, 191, 195, 200
|
238
|
Serious corrosion of equipment
|
191, 325
|
240
|
No anti-corrosion treatment in tailings facilities
|
238
|
241
|
Unqualified anti-corrosion materials
|
193, 238
|
260
|
Improper handling of local hydraulic phenomena
|
234, 238, 267
|
267
|
Pipes and grooves deformation
|
191, 193, 234
|
268
|
Defects of the interception ring in pipe body
|
69, 192-193
|
269
|
The pipe body is in direct contact with the big rocks
|
191, 267
|
270
|
The outer wall of the pipe is not protected
|
191, 267
|
271
|
The dimensions of pipes, grooves, tunnels, etc. do not meet the requirements
|
191, 193, 234, 267
|
272
|
Pipes and grooves material unqualified
|
191, 193, 267
|
273
|
Subsidence or deformation of supporting facilities such as pipes, trenches and tunnels
|
191, 267
|
275
|
Excessive slope deviation for laying pipes, trenches, tunnels, etc.
|
191, 193, 234, 239, 267
|
276
|
Improper design of corners of pipes, grooves, tunnels, etc.
|
191, 193, 234, 267
|
277
|
Improper subgrade design of Pipes and grooves
|
193, 234
|
278
|
Improper design of slope ratio of pipe trench and embankment
|
193
|
281
|
Poor quality of fill around the pipeline
|
191, 267
|
282
|
The axial filling height of the pipe in the dam body is different
|
191, 267
|
286
|
The joint length of the drain pipe is unreasonable
|
191-192, 267
|
296
|
Poor pump quality
|
192-193, 234, 307
|
299
|
Improper installation of pump
|
192, 195, 200, 234, 307
|
307
|
Pump failure
|
61, 100, 127, 192, 195, 200, 231
|
310
|
The surrounding environment improvement does not meet the requirements
|
19
|
312
|
Dam body renovation does not meet the requirements
|
62, 64-70, 73, 135-136, 148, 157-158, 167, 183
|
313
|
The improvement of flood discharge system does not meet the requirements;
|
191-192, 195, 234, 267, 273, 307
|
325
|
Monitoring instrument failure, work interruption
|
327, 343
|
327
|
Safety monitoring facilities cannot fully reflect the operating status of the tailings pond
|
19, 45, 47, 49, 65-69, 135-136, 191-192, 200, 267, 343
|
334
|
The number of water quality monitoring wells around the tailings pond is insufficient
|
327
|
Management factor
|
168
|
Improper measures to reduce the seepage line
|
167
|
170
|
Insufficient protection measures for seepage prevention facilities
|
158, 183
|
336
|
The setting of monitoring facilities is not included in the construction plan
|
325, 327
|
343
|
Inadequate safety evaluation
|
19, 60, 156, 190, 200, 327
|
346
|
Improper data management
|
38, 79, 162, 197, 199, 205, 207, 274, 299, 309, 324, 327, 343, 352
|
347
|
Insufficient or wrong hydrological and geological data
|
38, 79, 162, 197, 199, 205, 207, 274, 299, 309, 324, 327, 343, 352
|
351
|
Improper maintenance
|
60, 62, 64-70, 156-158, 167, 183, 190-193, 234, 238, 267, 307, 325
|
352
|
Design defects of emergency plan
|
19, 60, 62, 156, 190-191, 195
|
354
|
Insufficient emergency plan drills
|
19, 60, 62, 156, 190-191, 195
|
Personnel factor
|
38
|
Inaccurate storage capacity calculation
|
39, 194
|
75
|
Improper calculation method of tailings dam stability
|
64, 73, 77-81, 92
|
123
|
Improper selection and care of slope protection turf
|
73
|
124
|
Slope cutting did not follow the design requirements
|
19, 64-65
|
125
|
Slope protection was not carried out in time
|
19, 62, 64-65, 73, 122
|
126
|
Unreasonable design of cast-in-place protective surface
|
19, 62, 64-66, 73, 77, 122, 157
|
145
|
No coverage measures in the pond area
|
157
|
148
|
Weakness of paving has not been reinforced
|
158
|
130
|
Poor construction quality of horizontal paving
|
157
|
162
|
Unreasonable anti-seepage design
|
19, 156-157
|
199
|
The determination of the flood control standard of the tailing pond is not accurate
|
190, 194, 200
|
201
|
Blocking defects of flood drainage facilities
|
192-193, 195, 200
|
205
|
The installation location and elevation of drainage facilities do not meet the design requirements
|
193, 195, 200
|
274
|
Improper installation of supporting facilities
|
191, 267, 273
|
308
|
Closure design not in accordance with regulations
|
19, 62, 64-70, 73, 135-136, 148, 157-158, 167, 183, 191-192, 234, 238, 267, 273, 307
|
309
|
Close the tailings pond without understanding the hidden dangers and risks
|
66, 310, 312-313
|
324
|
Improper selection of monitoring instruments and equipment
|
327, 343
|
332
|
No monitoring of groundwater and surrounding water bodies
|
327
|
355
|
Insufficient experience in personnel or organization qualification problems
|
31, 38, 75, 79, 82, 61, 123-134, 145, 148-149, 162, 168, 170, 176, 197-199, 201, 205-207, 209-210, 218-221, 240, 260, 268-272, 274-278, 281-282, 286, 299, 308-310, 312-313, 324, 332, 334, 336, 343, 346-347, 351-352, 354
|